-5+8-28-10 0-3.4+5-4.6 _ 7 / 2-9 / 4 + 3 / 2 3 / 4-1.75-0-3
-5+8-28-10=-35 0-3.4+5-4.6=-3 -7/2-9/4+3/2=-17/4 3/4-1.75-0-3=-4
RELATED INFORMATIONS
- 1. If 1.78 + [1 and 7 / 8 * 0.8-3 (x + 3 / 9)] / 5 / 6 = 0.28, find X
- 2. Write 8 / 9, 8 / 8 / 5, 7 / 3, 6 / 5, 12 / 7, 28 / 9 to more than 3 / 4 or less than 3 / 4 More than 3 / 4: Less than 3 / 4:
- 3. Simplification: (1) 7 √ 3 - √ 1 / 3 (2) 3 √ 8-5 √ 32 (3) √ 4 √ 1 / 10 + √ 10
- 4. 3 √ 8-5 √ 32 7 √ 3 - √ 1 / 3 √ 40-5 √ 1 / 10 + √ 10
- 5. Simplify the following ratio: 7:4:3 20:6:5 1:0.75 120:32 36:5:9 10 2:3:9:4:8:5:4 1.25:0.25
- 6. The ratio is 0.36:1.36:0.32 2:25 120.25:6 5:8
- 7. Simplify the following ratios and calculate the ratio: (with process) 2 / 5 ∶ 1 / 4 1 / 20 ∶ 1 / 4 0.25 ∶ 1 48 / 32
- 8. 1.32:12 2.3.5:1.25 3.0.05:3 4.1:0.05 6.2.45:1.4 [ratio]
- 9. The data of time and temperature in an experiment are recorded in the following table: time 0,5,10,15,20,25,30, temperature 8,16,24,32,40,48,56 (1) If the temperature change is uniform, calculate the temperature when the time is Tmin. (2) calculate the temperature when the time is 16min
- 10. The number of large cubes is 1 23 4 5 6 7 8, the number of small cubes is 8 16 24 32 40 48 56 64, can't four small cubes spell the big one?
- 11. Find the ratio of the following ratios. 14; 35 2; 12.5 3 / 5; 7 2 / 7 (with process) Find the ratio of the following ratios 14. 35 2; 12.5 3 / 5; 2 / 7 (with process) Turn the following into the simplest integer ratio 40; 125; 18; 1.8 2 / 5; 1 / 4 (with process)
- 12. 4 out of 5: 8 out of 9?
- 13. 5:28:0.9 ratio Ratio
- 14. The ratio is 9:3.6 2 / 3 24 moleculars 32
- 15. Ratio: 9:3.6 32 / 24 2 / 3
- 16. 2 / 3 to 19 / 3 to 8 / 5 to 20.25 to 0.75
- 17. 1:0.75:8 = 4:0.25 = 1.2:2 and 1:4 = 3:4 = 0.25:25 = 8:2 = ratio
- 18. 31.4 divided by 3.14 = how much? The number in divided by 2, to calculate the formula
- 19. A job, originally planned to take 4 hours to complete, in order to pursue the perfect details, now 5 hours to complete, work efficiency than the original 1. A job, originally planned to take 4 hours to complete, in order to pursue the perfect details, now 5 hours to complete, work efficiency than the original reduced by several percent?
- 20. Simple calculation: 0.627 × 13 + 0.52 × 62.7 + 3.5 × 6.27