An engineering team built a road, which was 5 / 27 of the total length on the first day and 5 / 27 on the second day An engineering team built a road, which was 5 / 27 of the total length on the first day, 3 / 11 of the remaining length on the second day, 5 / 6 of the remaining length on the second day on the third day, and 8 km on the fourth day?

An engineering team built a road, which was 5 / 27 of the total length on the first day and 5 / 27 on the second day An engineering team built a road, which was 5 / 27 of the total length on the first day, 3 / 11 of the remaining length on the second day, 5 / 6 of the remaining length on the second day on the third day, and 8 km on the fourth day?

Backward push:
8 ÷ (1-5 / 6) = 48 (km)
48 ÷ (1-3 / 11) = 66 (km)
66 ÷ (1-5 / 27) = 81 (km)
A: the total length of this road is 81 kilometers