The square of ax - BX + ax + A-B factorization factor of BX
ax²-bx²-bx+ax+a-b
=x²(a-b)-x(a-b)+(a-b)
=(a-b)(x²-x+1)
RELATED INFORMATIONS
- 1. Factorization factor: the second power of 9A - 6ac + the square of C - the second power of 4B
- 2. 4b square C square - (b square + C square - a square) square factorization factor
- 3. Decomposition factors of 6ab & # 178; - 9A & # 178; B-B & # 178
- 4. 6ab-9a and 178; B-B and 179; how to decompose the factor
- 5. 4X (a-b) + (B Λ 2-A Λ 2) factorization
- 6. Factorization + - 4x + 1 =?
- 7. The solution of FX = 4x ^ 3-8x ^ 2 + X + 3 is 1.51 - 1.5. Then the factorization is (2x-3) (x-1) (2x-1). I know the cross multiplication of quadratic equation of one variable. Are these two the same
- 8. X ^ 3-4x ^ 2 + 2x + 1 factorization,
- 9. Given that the value of X in the solution of the system of quadratic equations 2x-5y + 3 = 0 and ax + y = 7 is 1, find the value of A
- 10. 18 degrees 25 minutes 36 seconds + 22 degrees 43 minutes 45 seconds =?
- 11. Square of a + square of ax-b + BX factorization factor 1. Use the square difference formula to get the value of (2 + 1) (the square of 2 + 1) (the fourth power of 2 + 1) (the eighth power of 2 + 1) (the 64th power of 2 + 1)
- 12. Factorization factor ax (Square-1 of Y) - ay (Square-1 of x)
- 13. Given that a minus 6A plus 9 equals 0, try to factorize x square plus ax minus 4
- 14. Factorization factor 4 (a-b) square-9a + 9b
- 15. How to factorize a ^ 2 + 2ab-3a-3b How to group and decompose a ^ 2 + 2ab-3a-3b
- 16. Factorization a ^ 2 + 2Ab + B ^ 2-3a-3b-4
- 17. Calculate the square of a of B-A of b-ab of a + B of B=
- 18. Calculate the square of (- AB) of square B of A
- 19. (a-b)(a+b)=______ (a-b)(a2+ab+b2)=______ (a-b)______ =a4-b4(a-b)______ =an-bn.
- 20. If we know that AB is a coprime number and 9A + 18B is the square of a number, how many pairs of numbers can a and B take The surface area of a cube is 384 square decimeters. Divide the cube into 64 equal small cubes. What is the surface area of each small cube? 3. A project with 14 workers can be completed in 12 days. How many more people will be needed if it is to be completed in the first four days