Stair step method

Stair step method

Friend, I don't know your construction, supervision or construction unit. Let me talk about my own opinion
1. We have been using the old atlas all the time, but the old atlas only has provisions on the method of anti-skid bench
2. If there is no clear indication of the node practice in the construction drawing (such as: there is a step angle protection node drawing or text description or involving change documents), the construction party can completely refuse the practice. If there is a design change, the construction party should put forward the cost increase request to the construction unit
3. If you are the construction unit or the supervision unit, you should or suggest to put forward the requirements of design changes or design supplementary documents to the design unit, increase the angle protection method by issuing changes to the design unit, and compensate the construction unit
No matter what aspect, we should solve this problem from the perspective of being responsible for the quality of construction products