What is notoginseng lime soil?

What is notoginseng lime soil?


In construction, the volume ratio is generally used, and the quantity of shovel or trolley is used. But from the quota consumption, the 3:7 lime soil contains 0.51912 tons of lime and 1.06353 cubic meters of clay, the equivalent weight is 0.51912t of lime and 1.22306t of clay, 0.51912/1.22306 = 0.4244 ≈ 3 / 7 = 0.4286



What is the moisture content of notoginseng lime soil?
We need a rough number


10.5%



Volume ratio or mass ratio of notoginseng lime soil
Quicklime or hydrated lime


Notoginseng lime soil is the volume ratio, the image point is the mixture of three shovels of lime and seven shovels of soil
Lime powder should be regarded as hydrated lime