C30 concrete should be prepared for 100t cement, 250t sand and 300t stone in a construction site. The starting mix ratio is 1:2.04:3.47, and the cement consumption per cubic meter is 350kg How many cubic meters of concrete can be mixed with the materials stored in the next yard?
The mixture ratio is 1:2.04:3.47,
Converted into material consumption: per cubic meter: cement consumption = 350kg * 1 = 350kg, sand consumption = 350 * 2.04 = 714kg, stone consumption = 350 * 3.47 = 1214.5kg
Calculation of available material production:
Cement 100t / 0.35 = 285.7m3
Sand 250t / 0.714 = 350.1m3
Stone 300t / 1.2145 = 247.0m3
It can be seen that the quantity of stones is the least, which restricts the production of 247 cubic meters of concrete
In the design of a concrete mix proportion, it is known that the unit water consumption is 180kg, the water cement ratio is 0.7, and the mass sand ratio is 35%. According to the mass method, the unit stone consumption is () kg, and the apparent density of concrete is 2400KG / m. A.687 b.733 c.1276 d.1362
180 / 0.7 = 257kg cement
Concrete bulk density: 2350-2450, take the middle value of 2400KG / m3
2400-180-257 = 1963kg, which is the total weight of sand
1963 * 35% = 687kg this is the weight of sand
1963-687 = 1276kg this is the weight of the stone
When C30 concrete is prepared, the unit water consumption is 180kg, the water cement ratio is 0.45, the sand ratio is 35%, and the apparent density of concrete is 2400KG / m3 without admixtures, the unit sand consumption is () kg
45 = 400, cement dosage 400kg, apparent density 2400, sand dosage 2400-400-180 = 1820kg, sand ratio 35%, sand dosage 1820 × 35% = 637kg