A road repair team wants to build a 48 kilometer long road. It has built 8.4 kilometers seven days ago. According to this calculation, how many days will it take to finish the road? No equations, OK?

A road repair team wants to build a 48 kilometer long road. It has built 8.4 kilometers seven days ago. According to this calculation, how many days will it take to finish the road? No equations, OK?


You don't have to use the equation
(48 - 8.4)÷(8.4÷7)
= 39.6 ÷ 1.2
=33 (days)
[Qiufeng Yanyan is right for you]
If you don't understand, you can continue to ask this question, online at any time, etc
Please select it as a satisfactory answer in time,



The workers built a road, which exceeded 140 meters in seven days, and the rest continued to build at the original speed, which could be completed in six days. How many meters is the total length of this road?


910m



The paving team paves a road, 2.5 kilometers per day, 5 / 8 of the total length in 7 days. How many kilometers is the total length of the road?


A: the total length of this road is 28 km



The paving team paves a road, 2.5 kilometers per day, 5 / 8 of the total length in 7 days. How many kilometers is the total length of the road?


A: the total length of this road is 28 km



A car delivering goods to the disaster area has driven 150 kilometers in three hours. At this speed, it has driven for six hours from place a to place B. Q: the road between place a and place B


150 km in 3 hours
150 / 3 = 50 km / h
Driving at the same speed for 6 hours, 50 × 6 = 300 km
That's all