(1)27°42′16〃+12°14′34〃= (2)58°26′17″-12°34′12″=

(1)27°42′16〃+12°14′34〃= (2)58°26′17″-12°34′12″=


(1)27°42′16〃+12°14′34〃=(27+12)°(42+14)′(16+34)〃=39°56′50〃
(2)58°26′17″-12°34′12″=57°86′17″-12°34′12″=(57-12)°(86-34)′(17-12)″=45°52′5″



121 ° 36 ′ - 31.8 ° (results in degrees, minutes and seconds)


121°36′-31.8°
=121°36′-31°48′
=89°48′
=89°48′00″
If you have to use seconds, write the last step. If you use seconds, it means that the accuracy of the calculation results has been artificially changed



(1) Express 60.37 ° in degrees, minutes and seconds
(2) 70 ° 25 ′ 12 ″


(1) Express 60.37 ° in degrees, minutes and seconds
60.37°=60°(0.37*60)′=60°22.2′=60°22′(0.2*60)〃=60°22′12〃
(2) 70 ° 25 ′ 12 ″
70°25′12〃=70°(25+12/60)′=70°25.2′=(70+25.2/60)°=70.42°



Calculation (results are expressed in degrees, minutes and seconds): (minutes') (seconds ″)
(1)100°32′+26.5°
(2)90°-27°36′
(3)7.8°=()°()′()″


(1)100°32′+26.5°=100°32′+26°30’=126°62’=127°2’
(2)90°-27°36′=89°60’-27°36′=62°24′
(3)7.8°=(7)°(48)′(0)″



Cost means 32 degrees, 44 minutes and 24 seconds; cost, minutes and seconds means 54.12 degrees


24 seconds = 0.4 minutes,
44.4 points = 0.74 degrees
So 32 degrees 44 minutes 24 seconds = 32.74 degrees
12 degrees
=54 degrees + 0.12 * 60 points
=54 degrees 7.2 points
=54 degrees 7 minutes + 0.2 * 60 seconds
=54 degrees, 7 minutes, 12 seconds



Please show me the following cost in minutes and seconds
1.752 ° equals () ° () ′ () ″
(14 out of 15) ° is equal to
16.24 ° is equal to
What's their calculation


Mathematical answer group answers for you
1°45'7.2"
56'
16°14'24"
Calculation method: take the integer unit, multiply the decimal part by 60, then take the integer part as the next level unit, and multiply the decimal part by 60



How many degrees is 216 degrees 42 minutes


216.7 degrees
42 divided by 60 equals 0.7
0.7+216=216.7°



12°32′42〃+26°18″
Formula


12°32′42〃+26°18″
=38°50′42〃



Using the same brick to pave 42 square meters of ground, we started to pave 18 square meters, and used 216 pieces. According to this calculation, how many more pieces will be needed to pave the fast ground
Equation do


It takes a total of X pieces to complete the bottom
216:18=x:42
18x=42×216
x=504
504-216 = 288 (pieces)
A: 288 more pieces are needed to finish the paving
You can ask me if you don't understand my answer!



With the same square brick paving area of 42 square meters, we started to pave 18 square meters 216 bricks. According to this calculation, if we finish paving this floor
How many more bricks do you need?


(216 ÷ 18) × 42 = 12 × 42 = 504 (pieces), 504-216 = 288 (pieces) a: 288 more bricks are needed after paving this floor